Nescot College
| Project | NESCOT College | |
| Client | Main Contractor / Trevor Blake | |
| Project Value | £160,000 | |
| Duration | 10 Weeks | |
| Location | Epsom, Surrey |
Client Brief
We carried out a full electrical rewire of the second and third floors within the North Wing of the building. The works also included further works of rewiring the new osteopathy clinic’s and two hair salon studios, together with all associated hallways, landings, and toilet areas. This also included the installation of all new emergency lighting, new distribution boards, and new sub-main distribution.
Scope of Works
- Full electrical first & second fix
- Containment systems (tray, trunking, conduit & basket)
- Power distribution and sub-main installation
- Emergency lighting design install & certification
- Energy-efficient lighting solutions
- Testing, commissioning & certification
Key Challenges
- Tight programme aligned with other trades
- Design changes mid-project
- High-spec finishes
The project operated on a compressed programme with multiple trades, requiring careful coordination to avoid delays.
The project was delivered within a tight programme through detailed planning, close coordination with other trades, and a flexible working approach. Regular site meetings and clear communication allowed design changes to be accommodated quickly without impacting overall progress. High-spec finishes were protected at all times, with careful routing of services, precise installation methods, and phased working ensuring that the quality of the completed spaces was maintained while meeting programme demands.
Outcome & Results:
- Project delivered on time and within budget
- Zero defects at handover
- Passed all inspections first time
- Positive client feedback
- Ongoing relationship / further works awarded
The project was completed on programme with zero defects at handover. The client has since awarded us on further contracts.